Barrier wall system
The term ‘barrier wall’ is used to refer to a system of external wall assembly that maintains weather-tightness by preventing the intrusion of air, water and vapour. Barrier walls rely on the integrity of the outermost surfaces and construction joints, and are considered a cost-effective alternative to cavity or solid wall assemblies.
The cladding material should be impervious to the elements. Common examples of barrier wall systems include:
- Single-skin metal wall panels.
- Solid-metal wall cladding.
- Precast concrete panels.
- Insulated metal-wall panels.
- Exterior insulation and finishing system (EIFS).
The exterior cladding in a barrier wall system serves as the main drainage plane – the element exposed to the weather. This differs from a cavity wall system where the main drainage plane and defensive line against bulk rainwater penetration is inside the cavity.
Careful installation of a barrier wall is crucial as the joints between facing units must be well sealed. The gaskets and caulking must be installed so that no water and/or air vapour can leak inside the cavity and damage the building envelope. There are often complex interface details that require specialist installation by professionals.
Although barrier wall systems often have a lower initial cost, this should be considered alongside the fact that they require a relatively high level of routine maintenance to remain effective over time as continued exposure to wind and rain can degrade the seals and lead to failure. Typically, they tend to be installed makes them more accessible should inspection or repairs be required.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.